Water resources and wetlands. 14-16 September 2012, Tulcea (ROMANIA) |
|
PRACTICAL SOLUTIONS FOR ECOLOGICAL RECONSTRUCTION OF GERAI POND Alexandru Dimache*, Iulian Iancu*, Nicolai Sirbu*, Ion Croitoru** *Technical University of Civil Engineering, Faculty of Hydrotechnics, Hydraulic and Environment Protection Department, Bucharest, Romania Abstract Gerai Pond is one of the last natural wetlands along the Danube, being connected to natural flooding regime of the Danube and is situated at the confluence of the Danube River, between Gârcov and Islaz localities, in Olt County. Aquatic vegetation characteristic is a favorable habitat for two species of conservation concern that nest along the Danube: red duck and pygmy cormorant. During 1961-1970, Gerai Pond has changed radically due to impoundment and draining under the program of drainage and flood meadow regulate of the Danube. These works of land reclamation for decreasing surface lakes and wetlands and water stagnation period, had reduced the breeding areas of the two species mentioned above. Ecological reconstruction of Gerai Pond project was conducted by Technical University of Civil Engineering of Bucharest in collaboration with E.P.A. Olt and W.W.F.-Romania. The project was based on a hydrological study (which included a component related to flooding) for the area analyzed, study in which were highlighted the areas which have water access to and from the Pond, surfaces and volumes of water corresponding to different rates, the optimal level of water for restoration of the nesting area. Based on this study were identified the areas of artificial feedwater discharge to and from the Danube. This paper presents the possible solutions for ecological reconstruction of Gerai Pond, identified in the project. Keywords: Gerai Pond, ecological reconstruction, flood, water discharge |
|
© Asociatia Romana de Limnogeografie (2008) |
|